Completed Projects2023-06-14T02:02:03+00:00

Projects | Completed Projects

Client Description Duration/Completion

Pakistan Aviators & Aviation (Pvt) Ltd.

Civil works of Aircraft Hangar Shed near Hajj Terminal, AIIAP, Lahore

May 2022 – Oct 2023

Pakistan Civil Aviation Authority

Civil, MEP, HVAC work for Construction of Double Storey Car Parking Area for 4,500 Cars at Allama Iqbal International Airport, Lahore.

Aug 2017 – Sep 2020

Civil Aviation Authority, Pakistan

New Benazir Bhutto International Airport. Construction of Cargo Complex and Allied Areas including Electrical Works.

Nov 2012 – Jun 2013

Pakistan Air Force

Additions/ Improvement/ Upgradation to Shahbaz Air Base and its Allied Facilities at Jacobabad Sind.

Apr 2009 – Aug 2011

Karachi International Airport

Terminal III at Karachi International Airport, Karachi.
Including Aprons and main terminal Building.
(Supply of Double Tee Roofing).

1986

Lahore International Airport

Terminal Extension.
(Supply of Double Tee Roofing).

1996

Nishat Group

Air Craft Hanger for Pakistan Aviators & Aviation (Pvt.) Limited (Nishat Group) at Walton Lahore.
Hanger building including Aprons and Taxiway.

1999

Client Description Duration/Completion

Elan Center Associates, Islamabad

Construction of Structure Works for Elan Tower/ Elan Square, F9/G9 Ibn-e-Sina Road Islamabad. Elan Tower is 21 Storeys (including 4 level Basements and a Ground Floor)

Dec 2017 – Nov 2019

Orient Group of Companies

Excavation, Shoring & Working Piles for the Orient Square building, Lahore

May 2019 – Nov 2019

Asghari Begum (Pvt) Ltd, Lahore

Civil & Electrical works for Construction of Hameed Latif Hospital Tower – I, Comprising of 15 (12+3) Storey Building. Structure and Electrical Works.

Oct 2015 – Mar 2017

Al–Siddiqui Developers, Faisalabad

Paradise Galleria, D–Ground, Faisalabad Construction of 10 Stories & 3 Basements Complex

Aug 2013 – Apr 2016

View Details

PRIMACO

Grey Structure & Facade Works Construction of Lahore Serena Hotel & Business Complex 17 Storey Building comprising 6 Basements.

Jun 2011 – Mar 2016

Fauji Fertilizer Bin Qasim Limited

Construction of FFBL Head Office Building, DHA Phase – 2, Islamabad

Jun 2012 – Feb 2015

Nishat Boutique Hotel

Construction of 9 Stories & 3 Basements Complex and Ancillary Building

Jul 2011 – Feb 2014

Attock Oil

Civil, Electrical, Plumbing, Firefighting and Finishing works for Construction of 14 storey Office Building at Morgah Rawalpindi

Jan 2010 – Jul 2012

Pakistan Telecom Tower Jinnah Avenue, Islamabad

Telecom Tower is 30 Storey (including 4 level Basements and Ground Floor) state-of-the-art commercial building

Oct 2007 – Sep 2011

Silver Oaks

Residential Complex
Luxury Residential Complex (13 Storey Building)

Nov 2008

Client Description Duration/Completion

DG Khan Cement Company Limited

Grey Structure & Finishing Work for the
Construction of ACC Building Auxiliary
Circulating Water Cooling Tower & Pump
Room, Raw Water Tank Remaining Works &
Pumps Room.

Sep 2022 – Oct 2023

D.G. Khan Cement Company Limited

Construction work of Hybrid Air Cooled Condenser Project at WHRPP & Under Ground Water tank with allied structure

Aug 2022 – May 2023

D.G. Khan Cement Company Limited

Civil Work (Grey Structure) Required for Main Cafeteria Building Hub, Balochistan

Oct 2021 – Jan 2023

D.G. Khan Cement Company Limited

Civil Works for Construction of 10,000 TPD Cement Plant, HUB, Baluchistan

Nov 2015 – Jun 2019

View Details

Pioneer Cement Limited, Lahore

Civil & Grey Structure for Construction of Pioneer Cement Head Office Building (3 Basements+GF+6 Floors), Lahore

Apr 2017 – Apr 2019

DG Khan Cement Company Limited, Lahore

DCKCCL RDF Processing Unit at Lakho Der, Lahore Civil, PEB, HVAC works RDF Shed (80mx60m), Raw Storage & Drying Commingled Solid Waste (150mx60m), Bio Gas Plant, Weigh Bridges (2 No.), Rain Water Collection Pond (capacity 7,700 cum), Diesel Tank & Dispensing Unit, Gate Office, Metering Room, Septic Tank, Main Maintenance Workshop, Toilet Block and Boundary Wall.

Feb 2013 – Feb 2015

DG Khan Cement Company Limited, Lahore.

RDF Processing unit at Multan

Jun 2013 – Mar 2014

DG Khan Cement Company Limited, Lahore.

Civil works & PEB Works of RDF Shed Phase III (60 x100) m shed

Feb 2013 – Apr 2014

DG Khan Cement Company Limited, Lahore.

Construction of Guest House (Civil, Electrical and Public Health Works) at DGKCCL Plant Dera Ghazi Khan

Dec 2013 – Aug 2014

DG Khan Cement Company Ltd. Lahore

Construction of Project Office Building, Hub Baluchistan

Oct 2013 – Feb 2014

DG Khan Cement Company Ltd. Lahore

Civil & PEB Works of Automatic Pack house & Substation.

Nov 2012 – Jan 2014

DG Khan Cement Company Ltd. Lahore

Construction of 7500 r.ft. precast Boundary Wall at Canal Side

Jan 2013 – Mar 2014

Cherat Cement Company Limited

Construction of Storage Bin, Conveyor and RDF Shed at Cherat Cement Plant, Nowshera

Dec 2012 – Aug 2013

DG Khan Cement Company Ltd. Lahore

Construction of Limestone Storage Shed DGKCCL, Dera Ghazi Khan

Apr 2011 – Dec 2011

DG Khan Cement Company Ltd. Lahore

Extension in RDF Plant Execution of Civil and Mechanical Works at DGKCC 6700 TPD Plant, Kallar Kahar

Feb 2011 – Dec 2011

DG Khan Cement Company Ltd. Lahore

Construction of Civil and Execution of Mechanical Works of RDF Plant at D.G. Cement Company Limited Construction of 6700 TPD Cement Plant at Kallar Kahar

Feb 2010 – Feb 2011

DG Khan Cement Company Ltd. Lahore

D.G.K. Cement Company Limited, Lahore Waste Heat Recovery Power Plant Capacity 10.4 MW, Heat Exchanger and Pre Duster at PH1 & PH 2 at Dera Ghazi Khan

Feb 2008 – Sep 2010

DG Khan Cement Company Ltd. Lahore

D.G.K. Cement Company Limited, Lahore Construction of 10,000 TPD Cement Mill, Sub Station Etc. at Dera Ghazi Khan

Oct 2008 – Sep 2009

Pakistan Cement Company Limited

Construction of Coal Firing Plant (Civil and Mechanical Works) Kallar Kahar, Chakwal

Oct 2007

DG Khan Cement Company Ltd. Lahore

Construction of 6700 TPD Cement Plant at Kallar Kahar near Village Khairpur District Chakwal
Civil, Pre-Engineered Steel Structure, Mechanical, Fabrication & Erection Works

Jul 2007

Client Description Duration/Completion

Lucky Power Company

Civil construction of Coal Shed including 130 piles at Lucky Power, Port Qasim, Karachi.

Dec 2022 – Sep 2023

Pakistan Atomic Energy Commission

Civil Works for the Construction of Category-II and III Structures at K2/K3 Nuclear Power Plants, Karachi.

Jun 2019 – Nov 2022

D.G. Khan Cement Company Limited

Civil Works for the Construction of 10MW Waste Heat Recovery and 30MW Coal Fire Power Plant with additional works at DG Khan Cement 10,000 TPD Plant Hub
Balochistan.

Dec 2019 – Dec 2021

D.G. Khan Cement Company Limited

Civil and Finishing Works for construction of Waste Heat Recovery Project at DG Khan Cement Plant, Khairpur, Chakwal

Mar 2019 – May 2020

DG Khan Cement Co. Ltd

30 MW Coal Power Plant, Dera Ghazi Khan Civil works consist of Main Building (TG + Dearator + Coal Mills), Main Building (Boiler), Mechanical WorksDesign Fabrication erection steel runway girders for 40ton crane, heater platforms,Boiler platforms, Stack ladder with platforms, erection of embedded parts

Mar 2015 – May 2016

View Details

Sitara Chemical Industries Ltd. Faisalabad

Construction of 316 Structural Piles for 35 MW Coal Fired Power Plant project

Jan 2015 – Apr 2015

Nishat Dyeing & Finishing Lahore

Extension of 9 MW Coal & Biomass Power PlantMain power building (detractor/ turbine/boiler)Precipitator, I.D. Fan, Flu Duct, Cooling tower, Circulating Pump Room, Transfer station & Ash Bins Etc.

May 2013 – Jun 2015

ICI Pakistan Limited

Civil Works for Polyester Plant – 15 MW Power Plant Project, Sheikhupura

May 2014 – Apr 2015

Nishat Mills Limited, Lahore

Construction of 6 MW Coal & Biomass Power Plant at Nishat Dyeing, Lahore

July 2011 – Oct 2012

Client Description Duration/Completion

Kia Lucky Motors Corporation Ltd.

Civil & Finishing Works Expansion of LAI Building

Feb 2021 – Sep 2022

Hyundai Nishat Motors (Pvt) Limited

Construction of TCF Extension Motor Pool Warehouse, Main & Plastic Paint Shop and Ancillary Works, Sahianwala, Faisalabad.

Dec 2020 – May 2022

Atlas Honda Ltd.

Rough Road Construction at AHL site, Sheikhupura.

May 2021 – May 2022

JW SEZ (Private) Limited

Design cum Construction services for the Automobile Testing Line
Construction Services for the Assembly Shop Machine Foundation
Construction Services for the Testing Line Machine Foundation

Jan 2021 – Mar 2021

KIA Lucky Motors Pakistan Ltd.

Construction of Underground Water Tank

Jun 2020 – Nov 2020

KIA Lucky Motors Pakistan Ltd.

Civil, MEP and PEB Works for Auto Parts Manufacturing Facility at KIA Lucky Motors Pakistan Limited Plant

Dec 2019 – Nov 2020

KIA Lucky Motors Pakistan Ltd.

Civil, MEP and PEB Works for Construction CKD Warehouse at Bin Qasim, Karachi

Oct 2019 – Jul 2020

Hyundai Nishat Motors Pvt. Limited

Civil Works of Main Mill Building and Ancillary Structures and Hyundai Nishat Motors Pvt. Ltd., M3 Industrial Estate, Saianwala, Faisalabad.

Apr 2018 – Jun 2020

Atlas Honda Limited, Sheikhupura

Civil Works and MEP Works including Electrical and Plumbing Works of Atlas Autos Extension, S.P. Logistics Shed, G.D.C. Building, H.P.D.C. & L.P.D.C. Extension, Oil & Paint Store and Paint, Chemical & Cylinder Store.

Mar 2017 – Mar 2019

Atlas Honda Limited, Sheikhupura

Construction Structural, Architectural, Plumbing, HVAC & External Works of GDC Building

Oct 2017 – May 2018

Honda Atlas Cars (Pvt) Ltd. Lahore

Construction of Museum, PC Warehouse, M.S. Building, W.E. Building, A.E. Building, G.E. Building, W.W.T.P Building, A.F. Building, P.O. Building, P.D.I. Building, Production Office, Spare Part Building, Paint Storage Building, Press Stock, Press W.E. Building, Site Office (Old), Scrap Platform, Press Pit Extension Building

Jan 2017 – Mar 2018

Atlas Honda Limited, Sheikhupura

Construction Structural, Architectural, Plumbing, HVAC & External Works of DDC-3 & Atlas Autos Ext. Sheikhupura

Mar 2017 – Feb 2018

Atlas Honda Limited, Sheikhupura

Structural, Architectural, Plumbing and HVAC Works for 1Million Assembly Hall & Welding Shop, I.E.

Nov 2015 – Dec 2016

New Allied Motors, Lahore

Auto Mobile & AC Plant Buildings

Jul 2008

Honda Atlas Cars (Pvt) Ltd. Lahore

Extension in Main Plant, Multan Road, Lahore

Mar 2007

New Allied Electronics (LG)

Warehouses Northern Bypass, Karachi

Jul 2008

Atlas Honda Limited, Sheikhupura

Building “500 K”, Sheikhupura

Mar 2007

Atlas Honda Limited, Sheikhupura

Miscellaneous Works, Sheikhupura

May 2006

Honda Atlas Cars (Pvt) Ltd. Lahore

Renovation and Extension Works Multan Road, Lahore

Nov 2005

Honda Atlas Cars (Pvt) Ltd. Lahore

Preparation works for Extension in Main Plant, Lahore

Nov 2005

Pak Suzuki Motors

Press Shop Building, Karachi

Jan 2005

Atlas Honda Limited, Sheikhupura

Miscellaneous Works, Sheikhupura

Jan 2005

Client Description Duration/Completion

Mirani Dam for WAPDA

40-km off Turbat, Construction of Mirani Dam. A Joint
Venture with Descon Engineering and Sarwar & Co. Main Dam Complete & Inaugurated in Nov-2006.

Nov 2006

Client Description Duration/Completion

Pak Gulf Construction (Pvt) Limited

Construction of Structure Work “Ramp-Mall Extension The Centaurus, Islamabad”

Jul 2021 – Jun 2023

Masood Fabrics Limited

Construction of Metro Cash & Carry Store and Shopping Complex, Multan. Package - 01A: Civil/Structural and Infrastructural works

Jan 2020 – Oct 2020

Packages Construction Co. (Pvt.) Ltd.

Grey Structure, Piling work, RCC Structure, Block Masonry work, Supply & Installation of Wall Cladding with FOC Insulation, External Pavement & Drainage, Roof Water Proofing System, Providing and Laying of Screed, Supply and Installation of Fascia Work & Structure Steel Structure Roofing System/ Fabrication and Erection Works. Communication, Security and Electrical Distribution system.

Sep 2014 – Jan 2017

Packages Construction Co. (Pvt.) Ltd.

Supply, Installation, Commissioning & Maintenance of Electrical Works

May 2015 – Apr 2017

MAF Hyperstar

Fit Out to Hyperstar at Packages Mall, Lahore
Complete Civil, Mechanical, PEB Structure, Fabrication, Erection, MEP, HVAC, Fire Fighting, Communication, Security System, Electrical Distribution System and Block work

Apr 2016 – Jan 2017

Nishat Hotel & Properties Ltd.

Excavation of 4 Basements & Retention Piles for Shopping Mall & Hotel Building at Nishat Trade & Finance Centre (Emporium Mall)

Mar 2013 – Aug 2013

MAF Hypermarket Pakistan (Private) Ltd. (Carrefour)

Construction & Fit-Out of Fortress Stadium Mall Including Hypermarket, Lahore

Mar 2009

Metro Cash & Carry, Safari Park, Karachi

Civil, PEB & MEP Works

Mar 2009

Metro Cash & Carry, Faisalabad

Civil, PEB & MEP Works

Jan 2009

Metro Cash & Carry, Islamabad

Civil, PEB & MEP Works

Mar 2008

Metro Cash & Carry, Lahore

Two Bridges 13×13 M Span 20 M, Road and Sewerage Works at Metro Cash & Carry, Thokar Niaz Baig.

Oct 2007 – Mar 2009

Client Description Duration/Completion

Ripha Medical City, Gulberg Greens Islamabad

Ripha Medical City Pilling Works including Excavation, Boring, Steel Caging and Concreting

Aug 2022 – Jun 2023

USAID Pakistan

Task Order # AID–391–TO–14–00006: Infrastructure Program Management Services for the construction of the Center for Advance Studies – Energy (CAS–Energy) at the National University of Sciences and Technology (NUST), Islamabad, Pakistan.

Apr 2014 – Apr 2017

View Details

USAID Pakistan

Task order proposal No. SOL –391–13–000023 For Comprehensive Program management services for the construction of a maternity ward at Jinnah Post Graduate Medical Center (JPMC) Karachi

Aug 2013 – Apr 2016

View Details

Sona Welfare Foundation, Karachi

Construction of Fauji Foundation Complex at Kot Ghulam Muhammad, Mirpur Khas, Sindh

Jan 2013 – Feb 2015

Islamic International Medical College Trust, Islamabad.

Construction of Riphah Hospital, Civil & HVAC Works

Apr 2014 – Mar 2015

National University of Science & Technology (NUST)

Construction of Hostel Ghazali – V

Jun 2010 – Sep 2011

National University of Science & Technology (NUST)

Construction of Hostel Package-IV UG Bi-Seater (Ghazali -II)

Sep 2009 – Dec 2010

National University of Science & Technology (NUST)

Construction of Institute of Manufacturing Engineering (IME) Department of Robotics Block

Jun 2008 – Sep 2010

National University of Science & Technology (NUST)

Construction of Medical Center

Jul 2008 – Mar 2010

National University of Science & Technology (NUST)

Construction of Staff Residence & Apartments Package – II, (Category – I & II Residences)

Mar 2007 – Feb 2010

National University of Science & Technology (NUST)

Construction of Staff Residence & Apartments Package – III, (Category – IV & V Residences)

Apr 2007 – Feb 2010

National University of Science & Technology (NUST)

Construction of Residential Accommodation

Mar 2007 – Feb 2010

National University of Science & Technology (NUST)

Construction of Printing Press

Jan 2010

National University of Science & Technology (NUST)

Construction of Boundary Wall Fence and Steel Gate

Jan 2010

National University of Science & Technology (NUST)

Construction of MT Shed & Offices

Jan 2010

National University of Science & Technology (NUST)

Construction of Staff Residence & Apartments Package – I, (Category – III Apartments) at NUST New Campus at Sector H-12, Islamabad

Feb 2009

Punjab School

Multistory School Building , Johar Town, Lahore

Jul 2008

Beaconhouse School System

Construction of Multistoried School Building Allama Iqbal Town Branch, Lahore

Dec 2005

National University of Science & Technology (NUST)

Training Block No. III, EME College
(NUST), Rawalpindi

Apr 2005

National University of Science & Technology (NUST)

Army Medical College
Construction of Girls Hostel for 100 Students (NUST), Rawalpindi

Mar 2005

National University of Science & Technology (NUST)

NIMS College
Construction of NUST Institute of Management Sciences, Rawalpindi

Mar 2005

National University of Science & Technology (NUST)

EME College
Construction of Dorms (Bi-Seater) for 120 Students EME College (NUST), Rawalpindi

Jan 2005

Client Description Duration/Completion

Riphah Medical City, Gulberg Greens Islamabad.

Riphah Medical City Hospital building structure Pile Works.

Aug 2022 – Jun 2023

Renacon Pharma Limited

Construction of Bored, Cast-In Place R.C.C. Piles for Plant Building and Overhead Water Tank, Faisalabad.

Jun 2017 – Jun 2020

Shaukat Khanum Memorial Cancer Hospital and Research Centre

Package A- Site Preparatory Works (Package-1), Shaukat Khanum Memorial Cancer Hospital and Research Centre, DHA City, Karachi

Feb 2019 – May 2019

Hameed Latif Hospital (Asghari Begum (Pvt) Ltd, Lahore)

Civil & Electrical works for Construction of Hameed Latif Hospital Tower – I, Comprising of 15 (12+3) Storey Building. Structure and Electrical Works.

Oct 2015 – Mar 2017

The Indus Hospital Punjab, QF NST NRQ Campus, Jubilee Town, Lahore.

Grey Structure works for Construction of 6 Storey above ground & 2 Basements of Hospital Building.

Jun 2017 – May 2019

USAID, Pakistan

Construction of Maternity Ward at Jinnah Post Graduate Medical Center (JPMC), Karachi.

Aug 2013 – Apr 2016

Islamic International Medical College Trust, Islamabad

Construction of Riphah Hospital, Civil & HVAC Works, Islamabad

Aug 2014 – Apr 2015

National Rural Support Programme (NRSP)

Reconstruction of Rural Health Center (RHC), Ali Sujal, Rawalakot

Apr 2008 – Dec 2008

National Rural Support Programme (NRSP)

Reconstruction of Basic Health Unit Rangla, Bagh

Apr 2008 – Oct 2008

Fatima Memorial Hospital, Shadman, Lahore

Lecture Theatre, Class rooms, Laboratories, Library, Staff Room etc.

Oct 1999 – Sep 2000

Surrayya Azeem (Waqf) Hospital

Surrayya Azeem Hospital Building

Sep 1997

Client Description Duration/Completion

MJMS (Pvt.). Ltd. (Formerly Stylo)

Construction of Production Unit for Fabrizio at QABP, Sheikhupura.

Feb 2022 – Nov 2023

Patex Industries

Civil Construction of PEB Building Foundations (Energy Plant Building) & Boundary Wall at Deh Kharisar Gharo, Sindh.

Jun 2022 – Jan 2023

Validus Engineering (Pvt) Ltd.

Validus Engineering Renovation Works
SITE Area Karachi.

Mar 2022 – Nov 2022

HNR (Pvt) Ltd.

Civil Works for Construction of Refrigerator Plant-II, Raiwind Road, Lahore.

Jul 2021 – Oct 2022

DWP

Civil & PEB Warehouse Building at Khanki
Mor, Multan Road, Lahore.

Mar 2021 – Oct 2022

Orient Materials (Pvt) Ltd.

Construction of Production Hall & Raw
Material Building at FIDEMC Phase II, M3
Industrial Estate, Faisalabad.

Aug 2020 – May 2022

Nippon Paints

Civil, Electro Mechanical Works for OEM Plant, Lahore.

Feb 2020 – May 2022

Lucky Motors Corporation Ltd.

Samsung SKD Mobile Device Manufacturing Facility at LMCL Port Qasim, Karachi.

Aug 2021 – Jan 2022

Aisha Steel Mills Limited, Karachi

Construction of CCL and CGL Plant for Aisha Steel Mills Limited, Karachi

Oct 2017 – Apr 2019

Aisha Steel Mills Limited, Karachi

Construction of CCM (Compact Cold Mill) & E-House for Aisha Steel Mills Limited, Karachi

Oct 2018 – Mar 2019

Aisha Steel Mills Limited, Karachi

Civil works for Construction of CCL and CGL Machine foundation PKG-1, 2 and 3 for Aisha Steel Mills Limited, Karachi

May 2018 – Mar 2019

Aisha Steel Mills Limited, Karachi

Civil works for Construction of Machine foundation

Mar 2018 – Oct 2019

Nippon Paint Pakistan

Civil, PEB and MEP works, including Electrical, Fire Fighting & Plumbing work of Finished Goods Warehouse and Road besides Finished Goods Warehouse

Jan 2018 – Sep 2018

Pak Electron Limited, Lahore

Civil Works for Construction of Warehouse Building including Additional works of PEL Unit 2, Lahore

May 2017 – Aug 2018

Allied Bank Limited

Construction of ABL Warehouse Building at Tatlayaali Road Industrial Area Kamonke, Gujranwala

Apr 2017 – Sep 2018

Digital World Pakistan (DWP)

Civil Works for Construction of Ware House Building, Islamabad

May 2017 – Apr 2018

Digital World Pakistan (DWP)

Construction of Double Storey Warehouse Building, Lahore

Oct 2016 – Oct 2017

Riaz Bottlers (Pvt) Ltd. Lahore

Civil and PEB work for Bottling Plant

Dec 2012 – Feb 2014

Lalpir Power Limited

Engineering, Procurement and Construction of Stores at Mehmood Kot, Muzaffar Garh

Oct 2012 – Nov 2013

Atlas Battery Limited

Civil and PEB Structure Works of Building at Sunder Industrial Estate Lahore

Jun 2011 – Nov 2011

Riaz Bottlers (Pvt) Ltd, Lahore

Construction of East, West & North Warehouses Civil Works & PEB Shed for Riaz Bottlers

Jan 2010 – Oct 2010

Nippon Paint Factory, Lahore

Civil Works, Infrastructure & Fabrication, Supply and Erection of PEB Structure (Turnkey Project)

Jun 2009 – July 2010

Pak Electron Limited Ferozpur Road, Lahore

Civil Works, Infrastructure & Fabrication Supply and Erection of PEB Structure (Phase- I & II), PEL-Transformer Unit-2

Feb 2008 – Mar 2010

Sharaf Logistics Pakistan (Pvt) Limited

Construction of Warehouse at Multan Road, Lahore

Dec 2009

New Allied Electronics (LG)

Warehouses Northern Bypass, Karachi

Jul 2008

Fedglobe

Warehouse, Sunder Industrial Estates, Lahore

Apr 2008

New Allied Electronics (LG)

Factory Building, Winder Near Karachi

Apr 2007

New Allied Electronics (LG)

Warehouse, Gujranwala

Apr 2007

Pak Rite

Warehouse, Karachi

Mar 2006

Empire Logistics

Warehouse, Karachi

Mar 2006

LG (New Allied)

Manufacturing Plant & Warehouse, Karachi

Aug 2005

Client Description Duration/Completion

TCF Media Group

Retention Pilling works for Swiss International Hotel & Resort
Total 138 Pile having dia of 2’ with depth 65’ at Lahore.

Feb 2022 – Feb 2023

Pioneer Cement Limited, Lahore

Civil & Grey Structure for Construction of Pioneer Cement Head Office Building (3 Basements+GF+6 Floors), Lahore

Apr 2017 – Apr 2019

Coca Cola Beverages Pakistan Ltd.

Construction of Coca Cola Head Office building is envisaged to have 7 stories including 02 basements, Civil, HVAC, MEP, Fire Fighting & Fire Separation, Fire Alarm, Communication, Security System, BMS etc.

May 2014 – Mar 2016

PRIMACO

Grey Structure & Facade Works Construction of Lahore Serena Hotel & Business Complex 17 Storey Building comprising 6 Basements.

Jun 2011 – Mar 2016

Proctor & Gamble Pakistan (Private) Ltd., Karachi

Hair Care Plant, Site Preparation & Infrastructure Civil, PEB Installation, Installation of Boilers, Compressors, HVAC, MEP, Plumbing, Fire Fighting & Fire Separation, Fire Alarm, Communication, Security System, BMS, Supply & Installation of Dock levelers, Associated works for Effluent Treatment Plant etc.

Jan 2015 – Feb 2016

Pearl Real Estate Holdings (Pvt) Ltd, Lahore

Construction of Substructure, Superstructure, including supply erection PEB Steel Structure, Precast Concrete Hollow Core Slabs, Finishing and MEP Works of Multi Storey Parking Plaza at PC Hotel Lahore

Dec 2013 – Mar 2015

Nishat Boutique Hotel

Construction of 9 Stories & 3 Basements Complex and Ancillary Building

Jul 2011 – Feb 2014

Client Description Duration/Completion

Gul Ahmed Textile Mills Ltd.

Construction of Power House including Civil, Building Works, Road Works, Drain, MS Stair at Doawood Mill & Dismantling & Re-construction of Masonry Wall at Gahforia, Landhi Industrial Area, Karachi

Nov 2020 – Jun 2023

Riaz Textile Mills

Civil Works for Construction of Spinning Unit-IV, Feroze Wattoan, District Sheikhupura.

Jul 2021 – Jan 2023

Nishat Mills Ltd.

Civil works for Construction of Mill Building and Cotton Godowns, M3 Industrial City, Sahianwala, Faisalabad.

Dec 2020 – Apr 2022

Gul Ahmed Textile Mills Ltd.

Construction of Entrance & Utility Buildings

Dec 2019 – Nov 2020

Gul Ahmed Textile Mills Ltd.

Construction of Mezzanine Floor

Jan 2020 – Nov 2020

Gul Ahmed Textile Mills Ltd.

Facade Works

Jan 2020 – Nov 2020

Nishat Mill Limited (Apparel Division)

Construction of Garment Unit No 2, Ferozpur Road, Lahore

Feb 2014 – May 2016

View Details

Nishat Apparel

Construction of Mill Building (Extension) of Nishat Apparel at Nishat Avenue, Ferozpur Road, Lahore

Jun 2010 – Nov 2011

Gulf Nishat Apparel

Construction of Textile and Garments Unit, Lahore

Apr 2007

Active Apparel

Construction of Textile Unit, Three Storey Building, Lahore

Nov 2006

Lucky Knitwear

Construction of Stitching Unit, Karachi

Nov 2006

Lucky Knitwear

Construction of Knitting Unit, Karachi

Oct 2006

AL–Nasr Textile Mills

Construction of Spinning Unit, Raiwind

Nov 2005

Riaz Textile Mills

Construction of Spinning Unit Sheikhupura Road, Feroz Wattoowan

Nov 2005

A.M. Textile

Construction of Spinning Unit Faisalabad

Aug 2005

H. Sadar Ali Akhter Ali Leather

Construction of Processing Unit Muridke Road, Lahore

Aug 2005

Anjum Spinning Mills

Construction of Spinning Unit & Power House, Shahkot, Faisalabad

Jun 2005

Comfort Textile Mills

Construction of Spinning Unit (Extension)

Jun 2005

Fazal Textile

Construction of Textile Unit, Nooriabad, Karachi ,Power House, Karachi

Jun 2005

Trowellers

Construction of Spinning Unit, Karachi

May 2005

Kamal Textile Mills

Construction of Processing Unit, Faisalabad

Jan 2005

Kohat Textile Mills (Saif Group)

Construction of Spinning Unit
Total Covered Area: 400,000 SFT

1967 – 1968

Client Description Duration/Completion

Packages Real Estate (Pvt) Limited

Structure Works for NESTLE Head Office –
Package-1 for Construction of Nestle
Head Office at Shahrah-e-Roomi, Amer-
Sidhu, Lahore.

Mar 2021 – Jul 2022

Coca-Cola Beverages Pakistan Limited

Design & Build (DB) of civil works, PEB works, Mechanical works and Electrical works

Mar 2019 – Mar 2021

Ecolean Pakistan Private Limited

Construction of Ecolean Packaging Plant at Sunder Industrial Estate, Lahore. The scope work includes Civil work, PEB Erection, External Works including Roads work, complete MEP Supply & Installation including HVAC, Fire Fighting and Fire Alarm

Apr 2018 – Dec 2019

View Details

Dalda Foods Private Limited

Construction of manufacturing Plant Buildings & Civil Works (New & Remodeling of Existing)

Nov 2014 – Jan 2016

Coca Cola Beverages Pakistan Ltd.

Civil, PEB, MEP and HVAC works for New PET Line, Water Tank Shed, Syrup Room Extension at CCBPL Gujranwala Plant.

Jan 2015 – Aug 2015

Riaz Bottlers (Pvt) Ltd. Lahore

Civil and PEB work for Bottling Plant

Dec 2012 – Feb 2014

Riaz Bottlers (Pvt) Ltd. Lahore

Construction of East, West & North Warehouses Civil Works & PEB Shed for Riaz Bottlers

Jan 2010 – Oct 2010

Kolson Food (Pvt) Limited

Construction at Karachi

Jul 2006

Shan Foods

Factory Building, Karachi

Jun 2006

Kolson Food (Pvt) Limited

Construction at Karachi

Feb 2006

Riaz Bottlers (Pvt) Ltd. Lahore

Husky Area, K.H.S. Line, Electrical Room and water treatment plant, Gulberg, Lahore.

May 2005

Client Description Duration/Completion

Kamalia Sugar Mills

Construction of New Sugar Mill Godowns including Water Proofing

May 2007

Kamalia Sugar Mills

Main Plant (Extension) including New Molasses Tank, Kamalia

May 2007

Mirza Sugar Mills

Lawari Sharif, Sindh

Jun 2005

Khairpur Sugar Mills Ltd. Khairpur, Sindh

Indus Sugar Mills Ltd

Rajanpur

Baba Farid Sugar Mills

1993

Ranipur Sugar Mills

Sakrand Sugar Mills

Ansari Sugar Mills

Tandlianwala Sugar Mills

National Sugar Mill

JDW Sugar Mills

Noon Sugar Mills

Digri Sugar Mills

Fecto Sugar Mill

Khazana Sugar Mill

Shahnoor Sugar Mills

Jaranwala Sugar Mills

Client Description Duration/Completion

Sitara Chemical Industries Ltd. Faisalabad

Pile Capping work (Foundation) for 35 MW Coal Fired Power Plant project, Faisalabad

Apr 2015 – Jun 2015

Sitara Chemical Industries Ltd. Faisalabad

Construction of 316 Structural Piles for 35 MW Coal Fired Power Plant project

Jan 2015 – Apr 2015

Packages Mall, Lahore

Construction of Structure Piles at Packages Mall, Lahore 179 Piles of Depth 15 M with dia of 760 mm 1080 Piles of Depth 20 M with dia of 760 mm Total Concrete : 12,227 Cubic Meter

Sep 2014 – Jan 2015

Packages Mall, Lahore

Backfill and compaction of ETP Drain Removal Excavation for Packages Mall, Lahore

Sep 2014 – Oct 2014

Nishat Mills (Apparel Division) Lahore

Construction of bridge over Hudyara Drain

Feb 2014 – May 2014

Nishat Hotel and Properties Ltd.

Design and Construction of Shoring Piles, Anchorage and excavation work on plot hotel site, trade and finance Centre,

Mar 2013 – July 2013

Metro Cash & Carry, Lahore

Two Bridges 13×13 M Span 20 M, Road and Sewerage Works at Metro Cash & Carry, Thokar Niaz Baig.

Oct 2007 – Mar 2009

Go to Top